Royal Liverpool & Broadgreen Hospital
ROLE OF HILTRON
Equipment advisors for a 568 bed new PFI build on the existing site of the Royal Liverpool hospital. Gross internal area of scheme: 120,000m2. Responsible for all areas of equipment, including hard and soft facilities management, working as part of the project team. Also, provision of equipment icons for the 1:50 drawings. Responsibilities include: training the Trust in PFIawareness; risk assessment; advising on procurement options; development of realistic costings; attendance at meetings, including user group meetings; management of the prequalification process; evaluation and assessment of bidders’ responses; development, ranking and pricing of long-list items and detailed development of short-listed options and preferred option; preparation of documentation, including change control sheets, room data sheets, bills of quantity and specifications; ensuring compliance with health standards, Trust policies etc.
Scope of Scheme: Facilities include: fifteen 28-bed inpatient wards; a 32-bed intensive care ward; an infectious diseases ward with nine isolation beds; a radiology department; eight heatres; renal dialysis (5 beds and 30 renal dialysis stations); a 20-bed haematology ward; an endoscopy department; an accident and emergency department including 36 emergency beds and emergency imaging; an outpatients department including audiology, cardio respiratory investigations, a fracture clinic, GI unit, neurophysiology and sexual health departments; pathology; pharmacy; an education centre; and appropriate support.
STATUS: 2008 Complete