60 Bed General Hospital, Al Nasiriyah
ROLE OF HILTRON
Calculation of the Requirements, Schedule of Accommodation for six 60 bed General Hospitals. Creation of operational Policies, carrying out the Building Design, Environmental Design and Engineering Design of the Building. Preparation of all Design Data, including Architectural, M and E, Environmental and Equipment.
STATUS: 2014 Ongoing